Five engagements across the data centre lifecycle — cabling, migration, smart hands, technical builds and workplace — for some of the world's most demanding operators.
Prepared for — Client Name · July 2026
Client names, project details and imagery are excluded or redacted for confidentiality.
About Optronix
The essential data centre partner.
A market-leading data centre and critical IT solutions provider, part of the GS Group — supporting clients from design and build through transformation, migration and operations. Sustainability is embedded throughout: an all-electric fleet, a sustainably-powered HQ, and greener choices in every design.
0years of industry experience
0regions served — UK, Europe, US, Middle East, Singapore, Australia, Japan
Enterprise DC environments in three regions needing a documented, standardised copper and fibre design
Future HPC scalability accounted for from day one
Existing sites below standard and no longer fit for purpose
Our approach
Discovery — site assessments and technical workshops
Design — copper, OS2 and OM4/5, compliant per region, HPC-ready
Global standardisation — one cabling, labelling and documentation spec
End-to-end delivery — materials, engineering, testing and handover
Case 01 — Results
A standard now rolling across 170+ sites.
Global standardisation
A sustainable infrastructure standard, fully documented and ready for the client's 170+ global sites.
Guaranteed for 20 years
Certified installer for all major manufacturers — 20-year warranty certification at handover.
Delivered within budget
Delivered in full alignment with the original quote provided before kick-off.
Retention & growth
The client commissioned us to refurbish 30+ data centres across the USA to the same standard.
"Partnering with Optronix enabled us to define and implement a global standard for our data centers. It's been a pleasure working with the team."
— Minesh P., Head of Infrastructure
Case 02 — Data Centre Migration
50+ racks. Two cities. Zero downtime allowed.
Client — global software companyLeaders in AI & HPC, trusted by governmentLondon · Frankfurt
The challenge
Expiring leases in London and Frankfurt with over 50 racks across both sites
Loss of control over infrastructure and environments, creating operational risk
Urgent transformation needed to regain control, reduce footprint, cut costs and implement standards
Our answer: the Optronix seven-stage migration process →
Case 02 — Our approach
Seven stages, one owner.
Click or hover a stage — arrows still change slides
Case 02 — Results
Zero failures. Zero downtime. On budget.
Successful migration
Zero hardware failures — on schedule, as planned, on budget.
Reduced costs
A transformative design cut energy usage and physical footprint.
Minimal downtime
Zero downtime to live services; every phase on or ahead of schedule.
Trust
Strengthened the relationship and our role as a long-term partner.
"The team at Optronix were great to work with — really organised, transparent, always on the ball. The migration went smoother than we expected, no disruption to live services."
— Steve B., IT Change Programme Director
Case 03 — Smart Hands Managed Services
Around the clock, across three cities.
Client — Chinese hyperscalerOperates DCs globallyLondon · Paris · Leipzig
The challenge
The same 24×7×365 service needed in three cities
The incumbent lacked urgency, sent underqualified engineers and regularly missed SLAs
Our approach
Integration — into the client's ticketing and comms channels
Responsiveness — engineers positioned for rapid deployment, strict SLAs
Execution — client-approved SOPs, from patching to switch config
Governance — every action logged and photographed into their DCIM
Case 03 — Results
Every request inside SLA.
Seamless integration
Full alignment with client systems and workflows — support without friction.
Rapid response
All requests actioned within SLA, with clean engineer handovers on multi-day issues.
Documented & audit-ready
Full ticket tracking and photographic evidence for governance compliance.
Trust
Consistent delivery led to an expanded, long-term relationship.
"Optronix have been a breath of fresh air compared to our last partner. Easy to work with, quick to get things done, reliable. We're looking forward to bringing them into more of our DCs."
— Eric NG., Network Architect
Case 04 — Data Centre Technical Build
Simultaneous builds, identical standards.
Client — Chinese hyperscalerLondon · Manchester · Paris · Frankfurt
0device rack, cable and configure projects
0cities built in parallel, to one methodology
Our approach
Experience — engineers proven in hyperscale environments
Management — on-site managers at every location, one project manager informed
Standardisation — a single repeatable methodology. No variations. No surprises.
Quality — every stage reviewed and validated across all sites
Case 04 — Results
Aggressive timelines, no compromise.
Urgent delivery, on budget
Simultaneous deployments met aggressive timelines without compromising quality.
Consistency
Every site delivered to the same technical standards and documentation.
Collaboration
Process improvements we introduced were adopted into the client's official build documentation.
Trust & growth
Now firmly established as their go-to partner for DC deployments and managed services.
"Simply put, Optronix have helped us achieve a more efficient way of deploying our DCs."
— Juan H., Global Infrastructure Lead
Case 05 — Office Fit-Out, Relocation & WiFi Commissioning
0 users moved. Nobody noticed.
Client — American mass media & entertainment conglomerateEuropean HQs — London · Paris
The challenge
400-user fit-out and relocations across two capitals
New WiFi survey, installation and commissioning
No interruptions to normal working hours — at all
Our approach
Out-of-hours phasing — every move planned around the working day
Seamless relocation — every desk, device and connection tested
Unified playbook — local teams in both cities, one reporting line
Everything delivered outside business hours — uninterrupted operations throughout.
Fully coordinated
400 users relocated across London and Paris, phased to milestones with bilingual teams.
Enterprise WiFi 6
Installed, commissioned and validated — ready for high user density from day one.
"Thanks to the entire team for their efforts and for working through the night to get us up and running on such aggressive timelines. You made this install and relocation much easier than we expected."