Optronix
navigate F fullscreen contents
Optronix · Feasibility Assessment Services

Is your site a
data centre?

An independent, evidence-based assessment for landowners, developers and investors — what your site can realistically support, what it's worth, and the right path to unlock it.

Prepared for — Client Name · July 2026

→  to begin
Contents

What we'll cover.

  • 01The data centre opportunity
  • 02What makes a site suitable
  • 03What the assessment delivers
  • 04Case study & why Optronix
  • 05Working with us
01 — The opportunity

Demand is compounding.
Suitable sites are scarce.

Cloud adoption, AI workloads and digitisation are driving operators and investors to hunt for land, industrial buildings and legacy facilities across the UK and Europe.

UK data centre demand growth forecast by 2030
£0bn+planned UK data centre investment pipeline
0days — typical assessment delivery timeline
01 — The opportunity

Three paths. Very
different outcomes.

Develop & operate

The highest return — and the highest capital requirement and delivery risk. You build it, you run it.

Develop & lease

Bring in an operator partner — long-term income with shared risk, at the cost of a slice of the upside.

Sell with consent

Sell the land and planning consent to a specialist buyer — the fastest, cleanest capital event.

Each path carries different capital, risk, timelines and returns. Choosing between them on evidence is what the assessment is for.

02 — What makes a site suitable

Operators score every site the same way.

Technical criteria

  • Grid connection & capacity — the single most important factor
  • Power infrastructure condition — substations, HV kit, distribution
  • Cooling potential — climate, water, building configuration
  • Structural suitability — loading, clear spans, height, condition
  • Fibre & connectivity — carrier hotels and dark fibre routes
  • Commercial criteria

  • Planning context — policy alignment and consent timeline
  • Location & latency — proximity to users and demand
  • Land & asset value — current use vs data centre value
  • Environmental constraints — flood, designations, reinforcement
  • Market demand — the realistic occupier or buyer pool
  • 02 — What makes a site suitable

    Existing industrial assets are
    frequently undervalued.

    Power infrastructure, structural steel, clear-span floor plates and established grid connections would cost tens of millions to replicate from scratch. Our assessment quantifies what is already in place — and what it is worth to a data centre developer or operator.

    Grid
    connections
    Power
    infrastructure
    Structural
    steel
    Clear-span
    floor plates
    03 — What the assessment delivers

    Six workstreams. One clear recommendation.

    01

    Site & infrastructure

    Structural review, power availability, cooling potential, connectivity and asset condition.

    02

    Planning & regulatory

    Development plan alignment, planning history, constraints and likely consent timeline.

    03

    Grid & power analysis

    Existing capacity, upgrade pathway and cost, renewables options, DNO engagement.

    04

    Market demand

    Operator demand, competitive supply, hyperscale vs colocation vs edge fit for your site.

    05

    Financial modelling

    Three-scenario ROI model — develop & operate, develop & lease, or sell — with payback and risk-adjusted return.

    06

    Strategic recommendation

    Not a list of options — a considered, evidence-backed view on the right path for your situation.

    03 — What the assessment delivers

    If the answer is sell
    we know the buyers.

    Optronix maintains active relationships with four qualified operators and investors currently seeking UK and European sites — from single-digit MW to campus scale, greenfield to legacy facilities.

    Separate engagement

    The introduction service is independent of the assessment — no obligation, terms agreed before any approach is made.

    Structured introductions

    Where your site fits a live requirement, we arrange the introduction and support the technical dialogue on both sides.

    Honest by design

    The assessment stands alone. Our recommendation is credible to investors precisely because we don't need it to end in a sale.

    04 — Case study

    A 200-acre university campus, two latent assets.

    An ageing 800kW facility and decades of surplus land. We assessed both in parallel — surveys, DNO engagement, planning review, market study and a four-path financial model — and the result went straight to the governing council.

    0MWgrid capacity confirmed on adjacent land within 12 months
    2.4 → 1.4PUE improvement pathway for the existing facility
    0%reduction in operational energy cost
    £2.5m/yrprojected lease income from the new 5MW colocation facility

    Outcome — a dual-track strategy: phased refurbishment + planning application for a new 5MW facility on surplus land.

    04 — Why Optronix

    We assess sites the way we build them.

    We build these things

    We deliver data centre infrastructure for some of the world's most demanding operators — AWS, Microsoft, Oracle, Meta. We know exactly what they look for, because we deliver it every day.

    EMEA-wide perspective

    Active across the UK, Europe and the Middle East, with reach into North America, Singapore, Australia and Japan — so your site is benchmarked against real competing locations.

    Independent advice

    A standalone advisory engagement — not a construction contract through the back door. If the right answer is to sell rather than develop, that's what we'll tell you.

    End-to-end capability

    If development is the answer, we take you from planning to a live facility — design, procurement, project management, commissioning and operations.

    05 — Working with us

    Fixed fee. Fixed scope. 90 days.

    01

    Consultation

    A structured briefing on the site, your objectives and known constraints.

    02

    Scope & fee

    Detailed scope and fixed-fee proposal within five working days.

    03

    Site investigation

    On-site surveys and primary data — typically two to three visits.

    04

    Analysis & modelling

    Market research, grid and planning engagement, scenario financial model.

    05

    Draft & workshop

    Draft report with a walkthrough session on findings and questions.

    06

    Final delivery

    Completed assessment plus a board-ready executive summary.

    £75,000 – £100,000 fixed, staged against milestones — against typical development capital of £5–10m per MW, clarity at this stage is cheap.

    Next steps

    Find out what your site
    is really worth.

    info@optronix.co.uk  ·  optronix.co.uk

    Optronix