Most estates carry risk nobody has measured. We assess yours objectively, as your advisor and not the facility's,
and tell you what would actually fail.
On-site, evidence-based scoring against the things that genuinely cause outages.
A clear picture of where the danger is and what it would take down with it.
A documented report you can act on, budget against and defend.
Example findings, drawn up to show the format. Yours come from your own site, photographed and referenced.
Four domains, and the checkpoints inside each one. Every checkpoint is scored against the same framework,
so this year's assessment can be compared with next year's.
Example findings. Every assessment plots its own, and the report sets out why each one sits where it does.
Six stages, run the same way every time, so this year's assessment can be set beside next year's.
Hover to pause. Click a stage to jump.
The estate is the same. What changes is that you now know which racks are green, which are amber,
and which one is the outage waiting to happen.
Drag the divider. One tile is one rack, scored. Example scoring on a forty-rack hall.
The report is the product. It is written so that somebody who was not on the survey
can pick it up, see what matters and start work.
Every area scored against a consistent framework, with the single points of failure called out by name.
What to fix first, why, and what it protects, with planning-level costs, not a wish list.
Every material finding photographed and referenced. Nobody has to take our word for anything.
Scored out of 5 against the framework in section 2.
| # | Finding | Domain | Risk | Fix |
|---|---|---|---|---|
| 1 | Both rack feeds from one board | Resilience & tier | Critical | Re-feed the B side, prove with a live transfer |
| 2 | Cooling N+1 in name only | Resilience & tier | Critical | Return the unit to service, then test under load |
| 3 | Hall door held open on deliveries | Compliance & security | Critical | Monitored contact and a controlled delivery route |
| 4 | Patch leads unlabelled at both ends | Cabling & pathways | Critical | Trace, label and re-patch to one scheme |
| 5 | Cold aisle open at the row end | Power & capacity | High | End doors, blanking plates, re-measure inlets |



Delivered as a document and walked through with your team at the debrief.
Drag the slider for the indicative shape of an assessment at your scale.
Illustrative planning figures. Every engagement is scoped properly before we commit numbers, and access constraints matter more than rack count.
A higher-education client asked us to assess a long-evolved server estate. Years of organic growth, and no single view of risk. We surveyed every rack and ranked everything we found.
Client identifiers withheld; figures rounded.
Register format only. Not this client's data.
Jane Street
Quadrature
UK Government (MoD)
Rackspace
Because we design, build and operate data centres, our assessments are grounded in what actually goes wrong.
If you want it, we are also the team that can put it right.
A rack count, a site list and whatever records you already hold are enough to start. We will come back with the survey plan, the access we need and the shape of the report.