Optronix Optronix
←→ navigate F fullscreen contents

Data centre
assessments.

Know the risk before it bites. An objective, on-site audit of resilience, capacity and cabling.
Service pack    Commercial in Confidence
→  to begin    F for fullscreen
Contents

What we'll cover.

    The proposition

    Know the risk before it bites.

    Most estates carry risk nobody has measured. We assess yours objectively, as your advisor and not the facility's,
    and tell you what would actually fail.

    Objective

    On-site, evidence-based scoring against the things that genuinely cause outages.

    Risk, ranked

    A clear picture of where the danger is and what it would take down with it.

    Actionable

    A documented report you can act on, budget against and defend.

    Who we work for The assessment is written for the party paying for it. Where the facility is someone else's, we still report to you.
    Inside the hall

    Findings, pinned where they happen.

    Plant room UPS A UPS B LV board Batteries Suppression Data hall CRAH 1 CRAH 2 CRAH 3 CRAH 4 Basket tray Detection Meet-me room Spare footprint Hall door and reader

    Example findings, drawn up to show the format. Yours come from your own site, photographed and referenced.

    Assessment    by domain

    What we assess.

    Four domains, and the checkpoints inside each one. Every checkpoint is scored against the same framework,
    so this year's assessment can be compared with next year's.

    Risk, ranked

    Likelihood against consequence.

    Example findings. Every assessment plots its own, and the report sets out why each one sits where it does.

    The method

    Scope to debrief, evidence throughout.

    Six stages, run the same way every time, so this year's assessment can be set beside next year's.

    Hover to pause. Click a stage to jump.

    The point of it

    What the assessment changes.

    The estate is the same. What changes is that you now know which racks are green, which are amber,
    and which one is the outage waiting to happen.

    01020304050607080910ABCD
    01020304050607080910ABCD????????????????????????????????????????
    Before, assumed fine After, measured and ranked
    22 low 12 medium 5 high 1 critical

    Drag the divider. One tile is one rack, scored. Example scoring on a forty-rack hall.

    The deliverable

    A report you can act on.

    The report is the product. It is written so that somebody who was not on the survey
    can pick it up, see what matters and start work.

    Scored, not vague

    Every area scored against a consistent framework, with the single points of failure called out by name.

    Prioritised fixes

    What to fix first, why, and what it protects, with planning-level costs, not a wish list.

    Photographic evidence

    Every material finding photographed and referenced. Nobody has to take our word for anything.

    The report

    What a page of it looks like.

    Data Centre Assessment

    3. Findings and scores

    Example pageRev 1.0
    3.1   Domain scores
    Resilience & tier2.4
    Power & capacity3.1
    Cabling & pathways2.0
    Compliance & security3.6

    Scored out of 5 against the framework in section 2.

    3.2   Prioritised remediation
    #FindingDomainRiskFix
    1Both rack feeds from one boardResilience & tierCriticalRe-feed the B side, prove with a live transfer
    2Cooling N+1 in name onlyResilience & tierCriticalReturn the unit to service, then test under load
    3Hall door held open on deliveriesCompliance & securityCriticalMonitored contact and a controlled delivery route
    4Patch leads unlabelled at both endsCabling & pathwaysCriticalTrace, label and re-patch to one scheme
    5Cold aisle open at the row endPower & capacityHighEnd doors, blanking plates, re-measure inlets
    3.3   Photographic evidence
    Fig 3.1   Patch field, meet-me room
    Fig 3.2   Containment and tray, ceiling void
    Fig 3.3   Distribution board, hall perimeter
    Example page. The layout and the scoring format are ours; the figures on it are illustrative, not a client's data. Page 11

    In the full report

    • Executive summaryThe estate in one page, critical findings named.
    • Method and frameworkWhat was checked, how, and what was out of scope.
    • Domain scoresScored the same way every time, so it compares later.
    • Findings registerEvery finding ranked, with its evidence reference.
    • Photographic evidenceFigures referenced from the findings that cite them.
    • Rack elevations and assetsWhat is in each rack, against the records.
    • Remediation planWhat to fix first, costed at a planning level.

    Delivered as a document and walked through with your team at the debrief.

    Scale it

    What would yours take?

    Drag the slider for the indicative shape of an assessment at your scale.

    Racks to assess 60
    Each mark is ten racks
     survey days on site, typical
     checkpoints scored across the estate
     ranked findings in a typical first assessment

    Illustrative planning figures. Every engagement is scoped properly before we commit numbers, and access constraints matter more than rack count.

    Proof    redacted

    A campus estate, measured at last.

    Higher educationMulti-building estateFirst full assessment

    A higher-education client asked us to assess a long-evolved server estate. Years of organic growth, and no single view of risk. We surveyed every rack and ranked everything we found.

    40+racks surveyed, rack by rack
    60+findings scored and ranked by consequence
    5critical risks fixed within the first quarter

    Client identifiers withheld; figures rounded.

    Findings register

    Example
    RefLocationFindingRisk
    DCA-007Critical
    DCA-011Critical
    DCA-018Critical
    DCA-022Critical
    DCA-031Critical
    DCA-044High
    DCA-052High

    Register format only. Not this client's data.

    Our engineers

    Where our engineers have worked.

    USAUKEuropeMiddle EastAustralia
    Why Optronix

    We assess what we could also fix.

    Because we design, build and operate data centres, our assessments are grounded in what actually goes wrong.
    If you want it, we are also the team that can put it right.

    01Strategy & AdvisoryThe assessment sits here
    02Acquisition & CommercialSourcing and site selection
    03Design & EngineeringWhitespace, M&E, cabling
    04Build & DeliveryFit-out, rack, stack and patch
    05Migration & TransformationMoves, waves and cutover
    06Operate & OptimiseManaged operations, smart hands
    No obligation The report is written the same way whether we do the remediation, someone else does, or nothing is done.
    Related decks

    More detail, deck by deck.

    Next step

    Tell us the estate.
    We'll scope the assessment.

    A rack count, a site list and whatever records you already hold are enough to start. We will come back with the survey plan, the access we need and the shape of the report.