The technology in a new office usually passes through ten or more firms. Most of what goes wrong on the first morning happens where one firm's work meets another's.
Ordered late, then held up by a wayleave or a blocked duct.
Carrier and landlordPlanned for racks, but left out of the cooling and power design.
IT team and M&EAccess points placed before the furniture layout was final.
WiFi designer and fit-outSet out to an earlier version of the desk layout.
Electrician and furnitureScreens and tables chosen after the walls were closed.
AV and building worksBought separately, without the power or display support the fleet needs.
Reseller and IT teamMissed until the analogue lines are switched off.
Landlord and telecomsNo as-built drawings, test results or asset register at handover.
Every installerEach firm is contracted on its own, and every handoff between them is left for you to manage.
A lease commits you to a building's ducts, risers, power and comms space for the whole term. We survey them before heads of terms are agreed, so any cost or delay is known while it can still be negotiated.
Which networks already reach the building, and what they can deliver.
Whether a second, separate route into the building exists.
Space left in the risers, and who controls it.
A room that can take racks, cooling and dedicated power.
Supply capacity for the floor and for the comms room.
4G and 5G coverage measured on each floor.
The landlord's fit-out guide, working hours and consent process.
Whether an agreement is in place, or still has to be negotiated.
A new leased line is often the longest lead item in a fit-out. A blocked duct or a missing wayleave can add months, so the order goes in as soon as the building is chosen.
Carriers and ISPs compared on live pricing and availability for the building's address.
Primary and secondary circuits on separate routes, so one dig in the street can't take the office offline.
Site surveys, wayleaves, duct work and excess construction charges managed with the carrier and the landlord.
A 4G or 5G service ready for day one if a circuit runs late, switched over when the line goes live.
Connectivity is sourced through AVANT Pathfinder, which compares more than 330 providers on real-time pricing and peer data.
×
×
Optronix and 3DEC design the technology together, in the same model as the architect and the M&E engineers.
The standard for each room type is written once in Satori, shared with everyone on the project, and checked room by room at commissioning. Nobody needs BIM software to read it.
Example standards shown. Yours are set during design.
An indicative programme for a single-floor fit-out. Yours is set from the survey and the design.
Every on-site works package is delivered by Optronix, to one programme, with one site team and one set of site rules.
Strip-out, partitions, ceilings, floors and decoration, programmed around the technology.
Small power to desks and rooms, comms room supplies and lighting.
Racks, UPS, cooling, earthing and access control, built and tested before the kit arrives.
Tray, basket and floor boxes, Cat6A and fibre to every outlet, and every link certified.
Access points installed, and the coverage measured against the design.
Screens, projectors, cameras, microphones, PA and room control, supplied, installed and commissioned.
Access control, CCTV and visitor management, installed and commissioned.
Desks, monitor arms and cable management installed, then every desk set up and tested.
Laptops arrive built, encrypted and enrolled in Intune. Before go-live, each desk is set up to its label, tested against this list, and the result is recorded in the asset register.
Rooms are built for Teams, Zoom or Google Meet, to their standard in Satori. Before go-live, each one is tested against this list and the result is recorded in the handover record.
Timings are indicative. If people are coming from another office, their kit is packed, moved against a manifest and set up to its new desk in the days before day one.
Illustrative planning figures for a single-site office, at an 80% desk ratio. Every project is surveyed and scoped before we commit numbers.
The office is handed over with a record of everything in it, so the next change is as easy to make as the first.
Containment routes, outlet positions, risers and comms rooms, as installed.
A result for every copper and fibre link. No sampling.
What is in every rack, and where every port is patched.
Designed and measured coverage side by side, with the access point schedule.
Every device by serial number, user, desk and warranty date.
Diagrams, the IP plan and configuration backups, handed over securely.
Every room checked against its standard in Satori.
Fire-stopping records, O&M manuals and manufacturer warranties.
Before the lease: what the building can support, and what it would take to make it work.
Optronix and 3DEC, from the brief to the technical design and tender pack, with the room standards set in Satori.
Design, every on-site works package, commissioning and the handover record.
All of that, plus the laptops and desks and support afterwards. If you are relocating, the move and the old office too.
We design it with 3DEC, Satori holds the room standards, and every on-site works package is ours. One programme and one point of contact from survey to handover.
Every link is certified, every desk is tested and every room is checked against its standard. The results are handed over, not summarised.
Our engineers have worked for Microsoft, Google, AWS, JPMorgan Chase and Jane Street, among others, and they bring the same method to an office floor.
Three photographs from one engagement, at different points in the install.
An address, a floor plan and a headcount are enough to start. We will come back with the building survey, the design approach with 3DEC and an outline programme.