The best way to shorten a site visit is to arrive with kit that is already built, imaged and tested. We do that work in our facility, so site time is install-only.
Assembled, firmware-loaded and configured to your standard build, so every unit matches the one you signed off.
Tested and burned in with us, so dead‑on‑arrival units and configuration faults never reach your floor.
Kit arrives install-ready, cutting hours of on-site work per rack.
Record fields follow your asset register and build standards.
BS-2041 Rev 1Example build sheet and asset label. Fields and formats follow your asset register and naming standards.
An illustrative wave plan. Real waves are set from your sites, your install dates and the kit in each.
A dedicated staging facility for servers, networking, storage and end-user devices. Kit is built, configured and tested there before it is dispatched to site.
An access-controlled facility. Every asset is logged in and out, with chain of custody throughout.
Build benches, imaging rigs and burn-in bays run as a production line, not an ad-hoc corner of a warehouse.
Fully insured, and shipped in install order with manifests that match what is in the boxes.
Illustrative planning figures from typical programmes. The exact split depends on device mix and build complexity, and every engagement is scoped properly before we commit numbers.
An illustrative install day for one rack of kit. Real timings depend on the kit, the build and the site.
A rollout programme staged its entire estate through our facility: built, imaged, burned in and shipped in wave order.
Client identifiers withheld; figures rounded.
Jane Street
Quadrature
UK Government (MoD)
Rackspace
Every hour of configuration done on a live floor is an hour of risk and cost. We move that work upstream into a controlled facility, so what arrives on site is ready to install.
One line, eight stations, the same checks on every unit, from goods-in to wave dispatch.
Test results and the build sheet go with the equipment in the delivery pack.
Our engineers have worked for Microsoft, Google, AWS, JPMorgan Chase and Jane Street, among others, and they bring the same method to the staging line.
A device list, your build standards and the installation programme are enough to start. We will come back with a staging plan, an example build sheet and a wave schedule.
Data Centre Lifecycle Experts