A rollout across many sites is only as good as its weakest install.
We make every site identical: planned, staged, deployed and proven to one standard.
Hundreds of devices across many sites, without the quality drifting site to site.
A single repeatable way of working. No variations, no surprises.
Every device tested and validated before we call the site done.
The same four stages on every rollout, whatever its size,
and the same things delivered at each one. Hover or click a stage to bring it forward.
Hover to pause. Click a stage to jump.
The same steps, in the same order, at the first site and at the last. Click a step to see the evidence it captures.
Example run sheet. The steps are agreed with you before the first wave, then they do not change.
An illustrative programme at the scale of the rollout on the proof slide: 300 sites, six waves, one wave a week.
Illustrative programme, built from the figures on the proof slide. Real wave sizes are set by your access windows and change freezes.
Progress by site and by day, the exceptions as they happen, and what is being done about each one. Click a status to filter.
| Site | Wave | Status | Evidence | Note |
|---|---|---|---|---|
| Site 041 | Wave 1 | Complete | 14 photographs, test pack | Signed off on site |
| Site 062 | Wave 2 | Complete | 14 photographs, test pack | Signed off on site |
| Site 094 | Wave 2 | Complete | 16 photographs, test pack | Signed off on site |
| Site 106 | Wave 3 | In progress | 11 photographs so far | Cabinet in, patching under way |
| Site 118 | Wave 3 | In progress | 6 photographs so far | Team on site, install under way |
| Site 127 | Wave 3 | Exception | Held at step 04 | Power to the comms position not live, electrician booked for Thursday |
| Site 147 | Wave 3 | Exception | Held at step 02 | Two units short on the delivery, replacements on the next van |
| Site 168 | Wave 4 | Scheduled | Awaiting install | Access window confirmed with the site |
| Site 232 | Wave 5 | Scheduled | Awaiting install | Kit staged, delivery booked for week 5 |
Example screen, showing nine of the 300 sites. Site references and notes are illustrative.
Two sites, three weeks apart, built to the same drawing. Pick a checkpoint to see what is identical.
Example cabinet elevations. Site references are illustrative.
Drag the slider. The indicative shape of a rollout at your scale.
Illustrative planning figures. Every engagement is scoped properly before we commit numbers, and real programmes are built around your windows, access and change freezes.
The last site gets the same preparation, the same sheet and the same reporting as the first.
Config and failures dealt with in our facility. Site visits become short, predictable and boring. Boring is the goal.
Every site works from the same run sheet, photographed at the same checkpoints. Drift can't hide.
You see progress by site, by day: greens, ambers, and what we're doing about the ambers.
A retail group needed edge infrastructure replaced across its whole estate
inside a change-freeze window, every branch, no misses.
Client identifiers withheld; figures rounded.
On-site leads at every location, one methodology, one quality bar.
Jane Street
Quadrature
UK Government (MoD)
Rackspace
Our teams have deployed at the scale where consistency is everything.
That discipline goes into every rollout, whatever the size:
stage first, install to one methodology, prove every unit.
A single project manager across every site and every wave, and one plan everyone works to.
Kit pre-built, imaged and tested in our facility, so site time is install-only.
Our engineers have worked for Microsoft, Google, AWS, JPMorgan Chase and Jane Street, among others, and they bring the same method to a multi-site rollout.
A site list, the kit going in and your change windows are enough to start. We will come back with a wave plan, an example run sheet and an outline programme.
Data Centre Lifecycle Experts