Critical IT
deployments.

Kit deployed, right first time. Large-scale, time-boxed rollouts across sites, to one methodology.
Service pack    Commercial in Confidence
→  to begin    F for fullscreen
Contents

What we'll cover.

    The proposition

    Deployed right, first time.

    A rollout across many sites is only as good as its weakest install.
    We make every site identical: planned, staged, deployed and proven to one standard.

    At scale

    Hundreds of devices across many sites, without the quality drifting site to site.

    One methodology

    A single repeatable way of working. No variations, no surprises.

    Proven per site

    Every device tested and validated before we call the site done.

    Deployment    by stage

    What we deploy.

    The same four stages on every rollout, whatever its size,
    and the same things delivered at each one. Hover or click a stage to bring it forward.

    01

    Plan & schedule

    Scoped to the estateSites, volumes and windows planned so the rollout is predictable, not chaotic.
    One ownerA single project manager across every site and every wave.
    02

    Stage & configure

    Ready before it shipsKit pre-built, imaged and tested in our facility so site time is install-only.
    03

    Deploy at scale

    Every site the sameOn-site leads at every location, one methodology, one quality bar.
    04

    Test & handover

    ProvenEvery device installed, tested and validated against the plan before sign-off.
    The rollout

    Plan, stage, ship, install, test, handover.

    Hover to pause. Click a stage to jump.

    Wave plan Six waves now One owner, one plan Staged stock Built, imaged and tested on the bench Tracked Sequenced to the plan Containment Same layout, every site Every port, against the plan As-built record Checkpoint photographs Asset and serial record Signed off on site
    Stage 01

    Plan

    The run sheet

    Every site works from the same sheet.

    The same steps, in the same order, at the first site and at the last. Click a step to see the evidence it captures.

    SITE RUN SHEETExample
    ProgrammeExample rollout
    Site refSite 128
    Wave3 of 6
    SheetRev 1
      Evidence

      Asset record

      Site 128   checkpoint photograph   same viewpoint at every site ASSET 0128-014 SN captured on site, fed to the asset register TEST RESULT PASS Site contact, on site Date Checked against the delivery Uploaded from site

      Example run sheet. The steps are agreed with you before the first wave, then they do not change.

      The programme

      Six waves, six weeks.

      An illustrative programme at the scale of the rollout on the proof slide: 300 sites, six waves, one wave a week.

      Drag through the weeks
      Week 6 of 6
      300
      sites deployed to the standard
      Waves complete6 of 6
      Sites in each wave50
      Sites still to go0
      Return visits for failed installs0

      Illustrative programme, built from the figures on the proof slide. Real wave sizes are set by your access windows and change freezes.

      The status board

      You see every site, every day.

      Progress by site and by day, the exceptions as they happen, and what is being done about each one. Click a status to filter.

      Rollout status Week 3, day 18 Example screen
      SiteWaveStatusEvidenceNote
      Site 041Wave 1Complete14 photographs, test packSigned off on site
      Site 062Wave 2Complete14 photographs, test packSigned off on site
      Site 094Wave 2Complete16 photographs, test packSigned off on site
      Site 106Wave 3In progress11 photographs so farCabinet in, patching under way
      Site 118Wave 3In progress6 photographs so farTeam on site, install under way
      Site 127Wave 3ExceptionHeld at step 04Power to the comms position not live, electrician booked for Thursday
      Site 147Wave 3ExceptionHeld at step 02Two units short on the delivery, replacements on the next van
      Site 168Wave 4ScheduledAwaiting installAccess window confirmed with the site
      Site 232Wave 5ScheduledAwaiting installKit staged, delivery booked for week 5

      Example screen, showing nine of the 300 sites. Site references and notes are illustrative.

      Consistency

      Site 001 and site 200.

      Two sites, three weeks apart, built to the same drawing. Pick a checkpoint to see what is identical.

      Example
      Site 001Wave 1, day 2 Evidence pack
      Site 200Wave 4, day 23 Evidence pack

      Example cabinet elevations. Site references are illustrative.

      Scale it

      How big is the estate?

      Drag the slider. The indicative shape of a rollout at your scale.

      Sites in the rollout
       parallel install teams, typical
      one marker per team on the road
       weeks to complete, typical
      one block per week of the programme
       devices proven working before sign-off
      one site, eight devices

      Illustrative planning figures. Every engagement is scoped properly before we commit numbers, and real programmes are built around your windows, access and change freezes.

      Why consistency wins

      The 200th site, as good as the first.

      The last site gets the same preparation, the same sheet and the same reporting as the first.

      01

      Staged upstream

      Config and failures dealt with in our facility. Site visits become short, predictable and boring. Boring is the goal.

      02

      Run sheets, not folklore

      Every site works from the same run sheet, photographed at the same checkpoints. Drift can't hide.

      03

      Live reporting

      You see progress by site, by day: greens, ambers, and what we're doing about the ambers.

      Proof    redacted

      300 sites, six weeks, one standard.

      A retail group needed edge infrastructure replaced across its whole estate
      inside a change-freeze window, every branch, no misses.

      Retail estateNationwideFixed window
      300sites deployed inside the window
      6weeks, first site to last
      0return visits for failed installs

      Client identifiers withheld; figures rounded.

      On site

      The same standard, whatever the postcode.

      On-site leads at every location, one methodology, one quality bar.

      A cabinet patched and labelled
      Patched, dressed and labelled so the next engineer can read it.
      Labelled cabling at the rear of a rack
      Every cable labelled at both ends, photographed as part of the pack.
      A finished office floor with devices in place
      The floor handed back, devices in place and working.
      Who we are

      Where our engineers have worked.

      USAUKEuropeMiddle EastAustralia
      Why Optronix

      Engineers proven at hyperscale.

      Our teams have deployed at the scale where consistency is everything.
      That discipline goes into every rollout, whatever the size:
      stage first, install to one methodology, prove every unit.

      One owner, every wave

      A single project manager across every site and every wave, and one plan everyone works to.

      Nothing ships untested

      Kit pre-built, imaged and tested in our facility, so site time is install-only.

      Engineers from critical estates

      Our engineers have worked for Microsoft, Google, AWS, JPMorgan Chase and Jane Street, among others, and they bring the same method to a multi-site rollout.

      Related decks

      More detail, deck by deck.

      Next step

      Send us the site list.
      We'll plan the waves.

      A site list, the kit going in and your change windows are enough to start. We will come back with a wave plan, an example run sheet and an outline programme.