Technical
engineering.

Hands-on engineering, done right. The people who physically build, cable and configure the hall.
Service pack    Commercial in Confidence
→  to begin    F for fullscreen
Contents

What we'll cover.

    The proposition

    Hands-on engineering, done right.

    Design is only half the job. Ours is the team that turns up, does the physical work to standard, and leaves a hall that's a pleasure to operate.

    Proven engineers

    Teams proven in hyperscale environments, from a single rack to a full hall.

    To standard

    Clean, documented, certified work. No shortcuts, no surprises.

    One methodology

    A single repeatable way of working across every site. No variations.

    Where we work A single rack to a greenfield hall, on live estates and new builds, out of hours where the site needs it.
    Technical engineering    by service

    Our engineering services.

    The same job, site after site Our staging facility Hall 1 Hot aisle Hot aisle Aisle door Cold aisle A, contained ODF Containment, overhead Under-floor route to Row A Overhead drops to Row B Row A Row B Expansion space
    Service 01

    The crew

    Who turns up, and what each of them leaves behind.

    ODF Permits and RAMS Handover pack
    Discipline 01

    Leaves behind

    On larger builds a project manager and a commissioning engineer run alongside the crew, with hold points and snags tracked to close.

    How every job runs

    Brief to handover, the same way, every time.

    On a rack swap and on a full hall alike. Hover to pause, click a stage to jump.

    Nothing reconstructed The pack is built while the work happens, stage by stage, and handed over at completion.
    Where the hours go

    The anatomy of a clean install.

    The visible install is less than half the job. The preparation and proof around it are why our work stays operable for years.

    Preparation & staging28%scoped, staged, checked before site
    Physical installation38%the part everyone pictures
    Dressing & labelling20%why it still looks right in year five
    Test & evidence14%proof it works, on paper
    Start of the day
    Drag through the day
    At this point
    Why it matters
    Under pressure

    Indicative split for a typical install day.

    To standard

    What good looks like, up close.

    RACK B07 0102030405060708
    1. 01
      Rack identityHall, row and position, printed on the rack and on every drawing.
    2. 02
      Fibre slack, managedSlack stored in the tray, bend radius held, cords ordered to length.
    3. 03
      Ports labelled at both endsOne scheme across the hall: panel, port, cord and drawing.
    4. 04
      A manager between panelsCords leave the port straight and stay off the frame.
    5. 05
      Vertical managersCords held clear of the door swing and the mounting rails.
    6. 06
      PDU out of the cable pathOutlets labelled to the circuit that feeds them.
    7. 07
      Blanking in every unused UAirflow is forced through the kit.
    8. 08
      Earthed and bondedRack and containment bonded back to a single reference.
    Example    cable label
    HALL 1 / ROW B / RACK B07 PP1-14  →  SW1 Gi1/0/14 OS2   2f   LC-LC   14 m

    The same scheme on the panel, the port, the cord and the drawing, on machine-printed labels.

    Example    test result
    Permanent linkCat6A
    StandardTIA-568, ISO/IEC 11801 Class EA
    Length41 m
    Insertion lossPass
    NEXTPass
    ResultPASS

    Every link is tested. Failures are put right and retested before the crew leaves.

    What ships with the job

    As-built drawings, cable schedules, rack elevations, test reports, the asset register and O&M manuals.

    Example rack elevation, label and test result, drawn for this page. The scheme on your job is agreed before the first cable is pulled.

    The work

    What our engineers leave behind.

    Four details from our own projects. This is the finish every job is measured against, and the reason a hall is still easy to work in years later.

    Fibre dressed to the field
    Fibre dressed to the fieldBend radius held, slack managed, every strand traceable.
    Containment run, level and true
    Containment run, level and trueSet out to the drawing, with power and data kept apart.
    Power dressed to standard
    Power dressed to standardCombed, tied at regular centres, labelled at both ends.
    Terminations, no shortcuts
    Terminations, no shortcutsMade to the manufacturer's method, then tested and certified.

    Our engineers, our projects, not stock photography.

    The people on site

    Where our engineers have worked.

    USAUKEuropeMiddle EastAustralia
    Proof    redacted

    Four halls, one summer.

    A colocation operator needed fit-out engineering across four halls in a single season: cabling, containment, rack and stack, without quality drifting between crews.

    Colocation operatorUKFour halls
    4halls delivered in one season
    1methodology across every crew and every hall
    0defects carried past practical completion
    How we hold it One brief, one set of method statements, one labelling scheme and one test regime, whichever crew is on site.

    Client identifiers withheld; figures rounded.

    Why Optronix

    Wherever the site, whatever the scale.

    SC-cleared where needed, on standby where it matters, and consistent everywhere. Our engineers do the work that everything else depends on, and back it with documentation you can operate from.

    SC-cleared where needed

    Security-cleared engineers for the sites and government estates that require them.

    On standby where it matters

    Crews held for the sites and the maintenance windows that cannot move.

    Documentation you can use

    Photos, test results, labels and as-built records. Every record is handed over whole.

    Related decks

    More detail, deck by deck.

    Next step

    Tell us the job.
    We'll put the crew on it.

    A drawing set, a rack schedule or a site address is enough to start. We will come back with the crew, the method statement and the programme.