Most clients meet us at one of three moments. This pack is about the middle one, the point where an empty room has to become a working data hall.
Sourcing, feasibility and facility audits. We help you find and choose the right site, powered by real market data.
Layout, containment, power and cabling, designed in our builder, installed, tested and certified as one accountable package.
DCOps, smart hands and managed services once you're live. The same team, through the life of the hall.
The model is drawn in this order on every job: rows first, then containment, power, cabling, enclosure and the record that goes with them.
Because the Whitespace Builder and our pricing engine are one system, a workable design and a budget price don't need a fortnight of workshops. Send us almost nothing, and get back a designed hall the same day.
Vendor-neutral throughout. The model specifies what fits your hall, not what anyone happens to stock.
A hall is sized for the load it has to carry. Everything else in the design follows from that.
kW per rack drives the layout, cooling strategy and power design, not floor area. We size for the load you'll run, not just the space you have.
Hot and cold air never mix. Containment, blanking and sealing are designed in from day one, the cheapest efficiency you'll ever buy.
Pathways, power and space sized so the next expansion is an addition, not a rebuild. Day-one fill is planned alongside the end state.
TIA-942 and ISO/IEC 11801 disciplines throughout, with every cabling link tested, certified and documented at handover.
One project manager owns the programme, the risk and the record from the first survey to the handover pack.
An empty space needed to become a production data hall, with racks, containment, A+B power distribution and a fully certified cabling plant, inside a building that stayed operational throughout, against a fixed delivery window.
The full hall was designed and approved in our Whitespace Builder before procurement. Delivery ran in coordinated stages, containment, busbar, racks then cabling, with out-of-hours working around the client's live operations.
Every rack position, busbar run and tap-off was placed in our Whitespace Builder and approved before order.
Client identifiers, location detail and commercial terms withheld. Figures rounded.
Illustrative plan and working windows. The real route, hours and permits are agreed with the building before the programme is fixed.
Case study the result
Delivered to the agreed programme. Staged works, out-of-hours where it mattered, no surprises at the end.
Zero disruption to live operations. The client's building carried on working around the build, and never noticed it.
Every cabling link tested and certified. Saved results, provably to spec and audit-ready at handover.
Documented handover. Labelling, as-builts and DCIM-ready records, so the hall is as easy to operate as it was to commission.
Reference calls with the client can be arranged under NDA.
Layout, separation, pathways and cabling designed and installed to the standards your auditors will ask about.
Every link tested with calibrated instruments and certified with saved results, provably to spec on day one.
Labelling, as-builts and DCIM-ready records at handover, so the hall is as easy to operate as it was to commission.
Jane Street
Quadrature
UK Government (MoD)
Rackspace
Our team has designed infrastructure for some of the largest data centre campuses in the world. The same discipline, model first, install to standard, certify everything, goes into every hall we deliver, whether it's twenty racks or two hundred.
And because we cover the whole lifecycle, the team that designs and builds your hall is the same partner that helps you choose it, migrate into it, and run it.
A drawing or a photo of the floor plan, a rack count or a target density, and what the building can give us for power. You will get a modelled hall in 2D and 3D, a budget price from the model, and a call to walk through it.
Data Centre Lifecycle Experts