One accountable partner for the whole build. Not a design here, an installer there, and the gaps between them left as your risk.
Every hall starts as a model. Layout, power, cooling and cabling designed together, so they can't collide on site.
Design, install, test and certify under one roof. One programme, one point of accountability.
Certified, documented and audit-ready. The hall is as easy to operate as it was to commission.
Every rack, busbar run and tap-off is placed before anything is ordered. A change at this stage is a click, not a variation.
Drag the divider.
Room dimensions, target racks and available power. Drag the slider to see the shape of what comes back.
Send us room dimensions, target racks and available power. The Whitespace Builder does the rest. Indicative figures; every engagement is scoped properly and every design is verified by an engineer before we commit numbers.
Illustrative quantities from a modelled hall; your schedule comes from the approved design.
One model produces the drawings, the schedule of quantities and the price, so the three cannot drift apart between the design and the site.
Pricing comes from the same system as the drawings. Move a row and the price moves with it. No re-quoting cycle.
A modelled hall and a budget come back the same day for most rooms. Decisions keep their momentum.
The drawings issued to site come from the approved model. What's built is what you signed off.
Six stages, one accountable team. Hover to pause, click a stage to jump.
An indicative eleven-week programme, the shape of the one behind the case study later in this pack. Yours is set from the survey and the design.
Jane Street
Quadrature
UK Government (MoD)
Rackspace
Nothing is taken on trust at handover. Every link, every circuit and every aisle is proved, and the results are handed over rather than summarised.
Copper and fibre tested to their category and handed over as results. No sampling.
Distribution load-tested and protection checked before any production load arrives.
Containment checked and airflow measured against the design, aisle by aisle.
Every rack, port, panel and circuit labelled to the same scheme as the drawings.
Layout, containment, power and cabling as installed, not as designed.
What is in every rack, and where every port is patched.
Asset and connectivity records in a form your DCIM or operations team can take on day one.
The snag list is worked down and signed off before we call the hall complete.
One team designs the hall and builds it.




Our engineers, our projects. Not stock photography.
A financial services client needed a new hall designed, built and commissioned inside a quarter, from an empty room to production load.
Client identifiers withheld; figures rounded.
Our team has designed infrastructure for some of the largest data centre campuses in the world. The same discipline goes into every hall we deliver, whether it is twenty racks or two hundred.
Because we cover the whole lifecycle, the team that designs and builds your hall is the same partner that helps you choose it, migrate into it, and run it.
Every hall is modelled before anything is ordered. A change at that stage is a click, not a variation.
TIA-942 and ISO/IEC 11801 disciplines throughout, with separation, pathways and labelling done the same way every time.
Every link certified, power proven under load and airflow checked against the design, with the results handed over.
Room dimensions, target racks and available power are enough to start. We will come back with a modelled hall, a budget and an outline programme.