Everything is live, everything is connected, and the window to move it is short. The difference between a clean cutover and an outage is planning, sequencing and rehearsal, not luck on the night.
An overrun on the night costs far more than the planning that would have prevented it. The window is the whole project.
Undocumented links and forgotten dependencies are what turn a move into an incident. We find them before the truck moves.
Split the move across vendors and the gaps between them become your risk. One accountable owner closes those gaps.
Four blocks of work, one team, one plan. Pick a block to see what we deliver in it.
Most estates hold surprises. Undocumented links, mystery cables, single points of failure. The audit turns unknowns into a plan, rack by rack, before anything is committed to a date.
Shared kit appears in more than one wave, shown in cyan. It moves once, and everything that depends on it is planned around that date. An illustrative estate, drawn the way an audit leaves one.
Matched to your estate, your dependencies and your window, not to a fixed method.
An illustrative single-window cutover, for an estate that can take one. Phased waves keep each window shorter. Your run sheet comes out of the audit, and it is rehearsed before the night.
Drag the slider for the indicative shape of a phased migration at your scale.
Wave size comes out of the dependency map, not the rack count.
Illustrative planning figures. The real programme comes out of the audit, not a slider, and every engagement is scoped properly before we commit numbers.
Every asset is scanned, tracked and evidenced through the move. Where you already run an ITSM or DCIM, we work inside it rather than around it.
Who touches your kit, how it travels and what happens if something goes wrong are all settled before the first rack comes out.
Security-cleared teams for sensitive estates, including government-adjacent and regulated environments.
Tracked vehicles, cleared drivers and chain-of-custody on every asset, door to door.
Full insurance across the move. Your assets are covered from rack-out to rack-in.
A global software company needed their production estate moved between London and Frankfurt, live, phased, with no interruption to service.
Delivered to the agreed window, on budget, every phase on or ahead of schedule. Client identifiers withheld, figures rounded.
A financial services firm had to be out of a legacy site by lease end, with no extension available. Audit to empty racks in under a quarter.
Client identifiers withheld, figures rounded.
Jane Street
Quadrature
UK Government (MoD)
Rackspace
Migration is the middle of the data centre lifecycle, and we are with you either side of it too. We help you choose the destination, design and build the hall you are moving into, run the move itself, and keep it running once you are live.
No roster of vendors. No gaps between them.
A rack count, the two sites and the window you have to work in are enough to start. We will come back with the audit scope, a migration strategy and an outline programme.
Data Centre Lifecycle Experts