The sustainable data centre: cut carbon and cost

Sustainability and economics used to pull in opposite directions. They no longer do. An efficient hall on 100% sustainable energy is usually cheaper to run as well as cleaner, and with AI driving energy use and reporting tightening, it is now a board-level subject.

Educational guidance, plus how Optronix helps. Energy figures are indicative; see the notes at the end.

Energy in, useful work outA flow diagram: 100 per cent sustainable supply enters on the left and splits into the IT load and the cooling and power overhead. At a PUE of about 1.1 the overhead is a thin band; the dashed outline shows the overhead at a legacy PUE of about 1.5.Supply100% sustainableIT load100Overhead~10 at PUE 1.1~50 at PUE 1.5Energy units per 100 of ITIndicative
Energy / flow
Dwg
OX-RES-14
Rev
4.0
Scale
NTS
sustainable supply we help clients move to, across EMEA
100%
PUE an efficient, contained, liquid-ready hall can reach, against ~1.5
~1.1
clients renewed at a lower rate on fully sustainable supply
2025
in a year: the multiplier on every kilowatt you save
8,760h

01 / Why nowSustainability is now an economic question

Three forces have converged. Energy is the largest operating cost of a data centre, so efficiency is money. Carbon is now reported, scrutinised and increasingly regulated. And AI has put data centre energy use firmly in the public eye.

The levers that cut carbon are largely the ones that cut cost: efficiency and sustainable supply.

01

Energy is the big cost

Power dominates data centre operating cost. Shave PUE, run warmer and buy energy better, and the savings compound every hour of every year.

02

Carbon is reported now

Scope 2 emissions, from the electricity you buy, sit in ESG reports and customer due diligence. 100% sustainable supply addresses them directly.

03

Regulation is tightening

The EU Energy Efficiency Directive and CSRD are bringing mandatory efficiency reporting and disclosure to data centres. It is better to be ahead of them.

04

AI raised the stakes

Rising AI power demand has made efficiency and clean supply a reputational issue as well as an operational one. Buyers and regulators are watching.

02 / Efficiency firstThe levers we build in

The greenest kilowatt is the one you never use. Before the question of where energy comes from, a hall’s design and build decide how much of it is wasted. These are the efficiency levers we engineer into every project, and they cut the bill as much as the carbon.

  • 01

    Airflow and containment

    Hot and cold-aisle containment, blanking and sealing stop supply and exhaust mixing: the cheapest, highest-return efficiency win, letting a hall run warmer and chill less.

  • 02

    PUE-led design

    We design for low PUE from the start, through airflow, cooling strategy, free cooling and liquid-readiness, not as an afterthought once the kit is in.

  • 03

    Free and liquid cooling

    Warm-water and free cooling cut or remove mechanical chilling, and liquid cooling pushes PUE towards ~1.1 and opens the door to heat reuse.

  • 04

    Local, low-carbon kit

    We specify sustainable products and source them as locally to site as possible, cutting the embodied carbon and transport emissions built into a project before it ever powers on.

  • 05

    Right-sized, with headroom

    Modular, phased fit-out means you power and cool what you are actually using, with no stranded capacity burning energy for racks that are not there yet.

  • 06

    Measured, not assumed

    Metering and DCIM make efficiency visible. You can only improve PUE and WUE if you measure them and act on the numbers.

03 / The overheadWhere the energy goes

PUE is total facility energy divided by IT energy. Everything above 1.0 is overhead: cooling, power conversion, lighting. Move the slider to see what that overhead means for a hall with a steady 1 MW of IT load, across the 8,760 hours of a year.

Tool 01PUE explorerPer 1 MW of IT load
Power usage effectiveness
1.50Legacy air-cooled
Facility draw
1,500 kW
Overhead a year
4,380 MWh
Against PUE 1.5
0 MWh

Arithmetic only: facility draw = IT load × PUE; overhead a year = IT load × (PUE − 1) × 8,760 h. The industry average of 1.56 is from the Uptime Institute (2024).

04 / The energy itself100% sustainable energy, at a better rate

Once a hall is efficient, the biggest single carbon move is the supply itself: switching to 100% sustainable energy. The assumption is that green costs more. Bought well, it often costs less, and that is what we help clients do.

01

A specialist broker, working for you

Through our partnership with Europe’s leading data centre energy broker, we help clients secure 100% sustainable energy at very competitive rates, with the buying power and market knowledge of a specialist.

02

Across EMEA

We support clients securing sustainable supply across the UK, Europe and the wider EMEA region, matched to where the sites actually are.

03

Lower bills and lower carbon

In 2025, several of our data centre clients renewed at a lower rate while moving to fully sustainable supply, cutting cost and emissions in one contract.

04

Scope 2, directly

Sustainable purchased electricity is the most direct lever on Scope 2 emissions: a fast, evidenced step towards net-zero and ESG goals.

Tell us roughly what you use and what you pay, and we will come back with an indicative view of a better, greener offer.

05 / Your numbersGet a better, greener energy offer

Set roughly what you draw and what you pay today. We will use it to prepare an indicative, no-obligation view of 100% sustainable supply at a competitive rate, and where the savings could sit.

Tool 02Energy enquiryTakes 30 seconds

Drag the sliders, add your details, and we will be in touch with an indicative offer. Your figures are only used to prepare it.

Average power drawn
1MW
Price you pay today
18.0p / kWh
Est. annual consumption
8,760 MWh / yr
Est. annual energy spend
£1.58 m / yr

No obligation. We use your figures only to prepare an indicative energy offer and will not share them. By submitting you agree we may contact you about it.

Thanks — that’s through to our energy team. We’ll be in touch with an indicative 100% sustainable offer based on your figures.

Indicative only. A real offer depends on your site, load profile, contract timing and the market on the day. The calculator assumes round-the-clock draw (kW × 8,760 h); actual consumption varies with utilisation.

06 / The metricsWhat gets measured and reported

Sustainability claims have to be backed by numbers. These are the metrics and frameworks buyers, auditors and regulators increasingly ask for, and that a well-run, efficient hall can answer with confidence.

PUE
Power usage effectivenessTotal facility energy divided by IT energy. The headline efficiency number: about 1.5 is legacy, about 1.1 is best in class.
WUE
Water usage effectivenessIncreasingly scrutinised alongside energy, especially where evaporative cooling is used. Designed for, not assumed.
Scope 1/2/3
Greenhouse-gas reportingSustainable electricity cuts Scope 2; local, low-embodied-carbon kit reduces Scope 3.
EED / CSRD
Regulation and disclosureEU efficiency and disclosure rules, plus corporate net-zero commitments, are turning good practice into reporting obligations.

07 / How Optronix helpsCutting cost and carbon from both directions

We help clients reach their net-zero and ESG goals, and cut energy cost, from two directions at once: efficient design and build, and 100% sustainable energy supply at competitive rates. From white-space design through to operations, sustainability is built into how we work.

Greener energy, lower bills

100% sustainable supply at a competitive rate

Through our partnership with Europe’s leading data centre energy broker, we help you move to fully sustainable supply, cutting Scope 2 emissions and cost together. Start with the calculator above.

Efficient by design and build

Efficiency engineered in from day one

Airflow and containment, PUE-led design, free and liquid cooling, and sustainable products sourced as locally to site as possible, so low energy use and low embodied carbon are designed in.

Related

Sustainability

Cut energy cost and carbon together.

Use the calculator above for an indicative green-energy offer, or talk to us about designing and building a more efficient hall, new or retrofit.

Share this guide with your team. Share on LinkedIn

Sources and notes

  • Optronix sustainability offering: 100% sustainable energy at competitive rates through a partnership with a leading data centre energy broker; 2025 client renewals at lower rates on fully sustainable supply.
  • Efficiency metrics: PUE and WUE per The Green Grid; greenhouse-gas Scopes 1, 2 and 3 per the GHG Protocol. Industry average PUE of 1.56 from the Uptime Institute global survey, 2024.
  • Regulatory context: the EU Energy Efficiency Directive (EED) and the Corporate Sustainability Reporting Directive (CSRD); ASHRAE thermal guidelines for efficient operation.

General guidance; calculator output is indicative, not a quotation. Consumption and spend are estimated from a constant-draw assumption (kW × 8,760 h) and the figures you enter; actual usage, rates and any offer depend on your site, load profile, contract and the market. Submitted figures are used only to prepare an indicative energy offer.