Power, cooling, security, fire suppression and IT infrastructure designed as one coordinated plan, then installed, commissioned and handed over ready to operate.

  • Architectural
  • M&E
  • Power and cooling
  • Fire
  • Security
  • Commissioning
Fig. 03 / Drawing to buildingIso view
Scroll
Dwg
OX-SVC-03
Stage
Design & Engineering
Rev
4.0
Scale
NTS

01Overview

Every discipline, one design.

Building a new data centre means coordinating several disciplines (power, cooling, security, fire suppression and IT infrastructure) and getting them to work together. We take the project from initial concept to a fully commissioned, operational facility.

Our design process brings these systems into a single, coordinated plan. We work closely with architects, M&E consultants and your own teams so the finished facility meets your capacity, efficiency and operational requirements.

Design capabilities

  • Architectural and M&E integration
  • Power and cooling system design
  • Security and access control
  • Fire detection and suppression
  • IT infrastructure planning
  • Standards and compliance alignment

02The drawing

One drawing set, concept to handover.

Follow an illustrative hall from concept to commissioning. The same coordinated drawing set carries every discipline from one stage to the next, so each stage builds on the last rather than starting again.

Fig. 03.1 / Data hall 01, general arrangement Stage 01, concept
Plan of an illustrative data hall, drawn from concept zones to a commissioned facilitySITE BOUNDARYWHITE SPACECAPACITY MODELCOOLING PLANTPOWER AND UPSENTRYLOADINGABCDE1234CHILLERCHILLERPUMPS AND PIPEWORKLVUPS AUPS BBATTCRAH10 RACKS @ 6001200DATA HALL 01L1 FATL2 SATL3L4L5 ISTSTATUSCOMMISSIONED, HANDED OVER

Stage 01 of 04

Concept

Feasibility, capacity modelling, site evaluation and the design brief: the requirements and constraints, agreed before detailed design begins.

  • Feasibility study
  • Capacity model
  • Design brief

Stage 02 of 04

Detailed design

Schematics, specifications, layouts and construction drawings across every discipline, coordinated into one set and ready for build.

  • Coordinated drawing set
  • Specifications
  • Equipment schedules

Stage 03 of 04

Install

Power, cooling, security, cabling and IT infrastructure installed to the drawings, with quality assurance at every stage.

  • Installed systems
  • Quality records
  • Snag list

Stage 04 of 04

Commission

Testing from factory acceptance to the integrated systems test, then the documentation and handover.

  • Level 1 to 5 test records
  • As-built drawings
  • Handover pack

Scroll to move through the stages, or choose one.

Illustrative drawing: a generic data hall, not a client facility.

03What's included

Concept, design, build, commission.

We work closely with architects, M&E consultants and your own teams, so the finished facility meets your capacity, efficiency and operational requirements.

  • 01

    Conceptual design

    Feasibility studies, capacity modelling, site evaluation and design briefs that set the requirements and constraints before detailed design begins.

  • 02

    Detailed design

    Full design documentation across all disciplines: schematics, specifications, layouts and construction drawings, ready for build.

  • 03

    Installation and build

    Installation of every system (power, cooling, security, cabling and IT infrastructure), with quality assurance at every stage.

  • 04

    Commissioning and handover

    Structured commissioning, testing and validation, then full documentation and handover, so the facility is ready to operate from day one.

04How we deliver

Commissioning, level by level.

Commissioning builds from single components to the whole facility. Each level has to pass before the next begins, ending in an integrated systems test.

  1. L1

    Factory acceptance

    Major plant tested at the factory before it ships.

  2. L2

    Site acceptance

    Delivered equipment inspected and checked on arrival.

  3. L3

    Pre-functional

    Installed, connected and labelled correctly, ready to energise.

  4. L4

    Functional

    Each system run and tested on its own against the design.

  5. L5

    Integrated systems test

    All systems tested together, under load and failure scenarios.

05At a glance

Specification

Disciplines
Architectural, M&E, power, cooling, security and access control, fire detection and suppression, IT
Stages
Concept, detailed design, installation, commissioning, handover
Design inputs
Feasibility, capacity modelling, site evaluation, design brief
Design outputs
Schematics, specifications, layouts, construction drawings
Commissioning
Levels 1 to 5, ending in an integrated systems test
Projects
New builds and refurbishments

06Questions

Common questions

Do you work with our architect and M&E consultants?

Yes. We work closely with architects, M&E consultants and your own teams, and bring their designs together into a single, coordinated plan.

New build or refurbishment?

Both. For a refurbishment we start from a survey of what is there, and plan the work around a live facility where we need to.

How does commissioning work?

It runs in five levels: factory acceptance, site acceptance, pre-functional checks, functional testing of each system, and an integrated systems test of everything together. Each level is documented and signed off before the next begins.

Can you run the facility afterwards?

Yes. Our management, operations and smart hands service picks up from handover, so the team that built the facility can help run it.