Stage 01 of 04
Concept
Feasibility, capacity modelling, site evaluation and the design brief: the requirements and constraints, agreed before detailed design begins.
- Feasibility study
- Capacity model
- Design brief
03Design & Engineering
Power, cooling, security, fire suppression and IT infrastructure designed as one coordinated plan, then installed, commissioned and handed over ready to operate.
01Overview
Building a new data centre means coordinating several disciplines (power, cooling, security, fire suppression and IT infrastructure) and getting them to work together. We take the project from initial concept to a fully commissioned, operational facility.
Our design process brings these systems into a single, coordinated plan. We work closely with architects, M&E consultants and your own teams so the finished facility meets your capacity, efficiency and operational requirements.
Design capabilities
02The drawing
Follow an illustrative hall from concept to commissioning. The same coordinated drawing set carries every discipline from one stage to the next, so each stage builds on the last rather than starting again.
Stage 01 of 04
Feasibility, capacity modelling, site evaluation and the design brief: the requirements and constraints, agreed before detailed design begins.
Stage 02 of 04
Schematics, specifications, layouts and construction drawings across every discipline, coordinated into one set and ready for build.
Stage 03 of 04
Power, cooling, security, cabling and IT infrastructure installed to the drawings, with quality assurance at every stage.
Stage 04 of 04
Testing from factory acceptance to the integrated systems test, then the documentation and handover.
Scroll to move through the stages, or choose one.
Illustrative drawing: a generic data hall, not a client facility.
03What's included
We work closely with architects, M&E consultants and your own teams, so the finished facility meets your capacity, efficiency and operational requirements.
Feasibility studies, capacity modelling, site evaluation and design briefs that set the requirements and constraints before detailed design begins.
Full design documentation across all disciplines: schematics, specifications, layouts and construction drawings, ready for build.
Installation of every system (power, cooling, security, cabling and IT infrastructure), with quality assurance at every stage.
Structured commissioning, testing and validation, then full documentation and handover, so the facility is ready to operate from day one.
04How we deliver
Commissioning builds from single components to the whole facility. Each level has to pass before the next begins, ending in an integrated systems test.
Major plant tested at the factory before it ships.
Delivered equipment inspected and checked on arrival.
Installed, connected and labelled correctly, ready to energise.
Each system run and tested on its own against the design.
All systems tested together, under load and failure scenarios.
05At a glance
06Questions
Yes. We work closely with architects, M&E consultants and your own teams, and bring their designs together into a single, coordinated plan.
Both. For a refurbishment we start from a survey of what is there, and plan the work around a live facility where we need to.
It runs in five levels: factory acceptance, site acceptance, pre-functional checks, functional testing of each system, and an integrated systems test of everything together. Each level is documented and signed off before the next begins.
Yes. Our management, operations and smart hands service picks up from handover, so the team that built the facility can help run it.
Design and installation
Talk to our design team about a new build or a refurbishment. We typically respond within one business day.