Optronix, a part of the GS Group

06Build & Delivery

Structured cabling,
tested
and documented.

High-density copper and fibre installations with clean routing, consistent labelling and a certified test result for every link.

  • Cat6A
  • Cat8
  • OS2
  • OM4 / OM5
  • MPO / MTP
  • TIA/EIA
Fig. 06 / Tray and trunkIso view
Scroll
Dwg
OX-SVC-06
Stage
Build & Delivery
Rev
4.0
Scale
NTS

01Overview

Immaculate labelling and organisation.

Structured cabling is the foundation of a data centre's connectivity. A well-designed, well-documented installation is reliable, easy to maintain and ready to scale, and it makes every later move, add and change quicker and safer.

We work across Cat6A, Cat7 and Cat8 copper, single-mode and multimode fibre, and MPO/MTP trunk systems. Every installation is designed, terminated, tested and documented to TIA/EIA, ISO/IEC and BICSI standards, and every cable we install is certified with TREND Networks test equipment.

What you get

  • Standards-compliant installations
  • High-density cable management
  • Full testing and certification
  • Immaculate labelling and documentation
  • Infrastructure designed to scale
  • Simpler, safer maintenance

02Media and test

Six media,
one certified result.

Choose a medium to see how it is built and where it is used, then select a port on the patch panel to follow its link end to end and see how it is certified.

Fig. 06.1 / Media we installCross-sections, not to scale
Cat6A cross-section: four twisted pairs around a cross separator inside the jacket U/UTP, 4 PAIRS

Category 6A copper

The default for horizontal runs to servers, top-of-rack switches and PoE devices. Supports 10GBASE-T over a full 100 m channel.

Class
EA, 500 MHz
Typical reach
100 m channel
Connector
RJ45
Certified with
LanTEK IV-S copper certifier
Fig. 06.2 / Link trace and certification Cat6A permanent link

R14 / PP03Patch panel A

Hover, tap or use the arrow keys

R14-PP03-P07R22-PP01-P07

LanTEK IV-SAutotest

LinkR14-PP03-P07

  • Wire mapPass
  • Length38.6 m
  • Insertion lossPass
  • NEXTPass
  • Return lossPass

ResultPass

Saved to AnyWARE

Illustrative example: port labels, lengths and results are not from a real installation.

03What's included

Designed, installed and certified.

One team owns the cabling from the first pathway drawing to the final test report, in a new hall or a live one.

  • 01

    Copper cabling

    Cat6A, Cat7 and Cat8 installations, terminated, tested and certified to industry standards, built for high-density environments where every connection counts.

  • 02

    Fibre optic cabling

    Single-mode and multimode fibre, MPO/MTP trunks, pre-terminated assemblies and high-speed interconnects for spine-leaf and cross-connect architectures.

  • 03

    Testing and certification

    Every cable tested and certified with TREND Networks equipment, with full test reports, as-built documentation and results held in the AnyWARE cloud.

  • 04

    Cable management

    Clean routing with proper containment, labelling and separation, so moves, adds and changes are faster and less disruptive.

04How we deliver

From pathway drawing to test report.

The labelling scheme and the test plan are agreed before a single cable is pulled, so the documentation is right by design rather than pieced together at the end.

  1. 01

    Survey and design

    Pathways, containment, rack positions and port counts agreed, with a labelling scheme and test plan.

  2. 02

    Install

    Containment, trunks and horizontal runs installed and dressed to bend radius, copper and fibre kept apart.

  3. 03

    Terminate and label

    Panels, cassettes and outlets terminated; every cable, port and panel labelled to the scheme.

  4. 04

    Test and certify

    Every link certified with TREND Networks equipment; anything that fails is fixed and re-tested.

  5. 05

    Hand over

    Test reports, as-built drawings and labelling records handed over, with results in AnyWARE.

05At a glance

Specification

Copper
Cat6A, Cat7, Cat8
Fibre
Single-mode OS2, multimode OM4 and OM5
Trunks
MPO/MTP, pre-terminated assemblies and cassettes
Standards
TIA/EIA, ISO/IEC, BICSI
Test equipment
TREND Networks, LanTEK IV-S certifier
Reporting
AnyWARE cloud results, as-built documentation
Warranty
25-year manufacturer system warranty through our accredited installer status

06Questions

Common questions

Which standards do you install to?

TIA/EIA, ISO/IEC and BICSI. We agree the standard, the labelling scheme and the test limits at design stage, and every link is certified against them before handover.

How is each link tested?

Every cable is certified with TREND Networks test equipment. For copper we use the LanTEK IV-S, which can certify a Cat6A link in seven seconds, and results are reported through the AnyWARE cloud platform, so you get a full set of test reports with the as-built pack.

Copper or fibre: how do you choose?

It comes down to distance, speed and density. Cat6A covers horizontal runs to 100 m, Cat8 suits short in-row links, multimode fibre covers short reach inside the hall and single-mode carries the backbone. MPO/MTP trunks make high-density fibre quick to install. Our structured cabling guide sets out the trade-offs.

Can you work in a live data hall?

Yes. Our engineers have live data centre experience, and we work to the site's change control, permits and access rules. Work near live equipment is planned and agreed in advance.

Do you remediate existing cabling?

Yes. We survey and test what is installed, then plan the remediation: re-routing, re-terminating, re-labelling or replacing, with the same certification and documentation as a new installation.

Structured cabling

Send us the drawings and the dates.

Talk to our cabling team about a new installation, an upgrade or a remediation. We typically respond within one business day.