Optronix, a part of the GS Group

08Build & Delivery

Staged off-site,
ready to rack.

We receive, inspect, update, configure, test, label and pack your equipment off-site, so the only job left in the data centre is the physical install.

  • Goods in
  • Firmware and BIOS
  • Build sheet
  • Asset tags
  • Secure packing
Fig. 08 / The staging floorIso view
Scroll
Dwg
OX-SVC-08
Stage
Build & Delivery
Rev
4.0
Scale
NTS

01Overview

Ready-to-deploy equipment.

Staging equipment off-site means less time in the data centre and less disruption to live environments. We receive, unpack, inspect, configure, test and securely pack your equipment, so it arrives on site ready to rack.

Everything is done to your specification: firmware updates, BIOS configuration, network settings, labelling and asset tagging. By the time it reaches your data centre, the only job left is the physical install.

What you get

  • Less time on site
  • Less disruption to live environments
  • Pre-configured, tested equipment
  • Full documentation and asset tagging
  • Quality checks before dispatch
  • Secure handling and packaging

02The staging line

The same checks, every unit.

Each device passes the same stations, and its record travels with it to site. Select a station to see what happens there. The unit and its details are illustrative.

Fig. 08.1 / The staging line
Unit 01

Station 01 of 07

Receive

Delivery checked against the order and serial numbers captured on arrival.

Adds to the recordSerial number and delivery check

Station 02 of 07

Inspect

Unpacked and inspected; any damage photographed and reported before work starts.

Adds to the recordInspection result, with photos

Station 03 of 07

Firmware

Firmware and BIOS updated to the versions on your build sheet.

Adds to the recordFirmware and BIOS versions

Station 04 of 07

Configure

Network settings and configuration applied from your build sheet.

Adds to the recordConfiguration applied, against the build sheet revision

Station 05 of 07

Test

Hardware validated and functional tests run, with the results recorded against the serial.

Adds to the recordFunctional test result

Station 06 of 07

Label

Labelled and asset-tagged to your scheme, and the asset register updated.

Adds to the recordAsset tag and register entry

Station 07 of 07

Pack

Packed securely with its records, ready to dispatch to site.

Adds to the recordPacking check and dispatch status

Unit recordSRV-0147, 1U server

  1. Serial capturedSN 7F3K-2291
  2. InspectionNo damage, photos on file
  3. Firmware and BIOSUpdated to baseline
  4. ConfigurationBuild sheet rev C applied
  5. Functional testPass
  6. Asset tagA-0147
  7. PackedReady to dispatch

Illustrative example: the unit, serial, versions and tags are not from a real deployment.

03What's included

Off-site,
to your specification.

Everything is done to your build sheet: firmware versions, BIOS settings, network configuration, labelling and asset tagging.

  • 01

    Equipment receiving

    Secure receiving, unpacking and inspection at our staging facility, with damage reporting, inventory checks and serial number capture on arrival.

  • 02

    Firmware and software updates

    Firmware, BIOS configuration and software updates applied to your specification, so equipment is current and secure before it leaves.

  • 03

    Configuration and testing

    Initial network configuration, hardware validation and functional testing against your build sheet, confirming everything works before it ships.

  • 04

    Documentation and packaging

    Asset registers, configuration records and labelling, then secure packaging for safe transport to your deployment site.

04How we deliver

From build sheet to rack.

Staging slots into the deployment plan: kit arrives on site configured, tested and labelled, ready for rack, stack and patch.

  1. 01

    Build sheet agreed

    Configuration standards, firmware versions, labelling scheme and test criteria agreed before kit arrives.

  2. 02

    Goods in

    Deliveries received, checked against the order and serial numbers captured.

  3. 03

    Stage and test

    Firmware, BIOS and configuration applied, then functional tests run against the build sheet.

  4. 04

    Label and pack

    Asset tags, labels and records completed; kit packed for transport.

  5. 05

    Deliver to site

    Dispatched with its documentation, ready for rack and stack.

05At a glance

Specification

Inputs
Your build sheet, firmware baselines and labelling scheme
Work
Receiving, inspection, firmware and BIOS, configuration, functional testing, labelling, asset tagging, packing
Records
Asset register, serial numbers, configuration records, test results
Faults
Recorded against the serial number and handled through your RMA process
Delivery
Secure packaging, with White Glove Logistics if you need transport
On site
Rack, stack and patch by the same team

06Questions

Common questions

What do you need from us?

A build sheet: the firmware and BIOS versions, network settings, labelling scheme and the tests that define done. We confirm it with you before the kit arrives.

What happens if a unit fails testing?

We record the fault against the serial number, report it to you and, if you want us to, handle the return through your RMA process.

Why stage off-site?

Less time and fewer people in the data centre, less disruption to live environments, and faults found on a bench rather than in a rack.

Can staged kit go straight to site?

Yes. It can travel with our White Glove Logistics service and be racked, stacked and patched by the same team on arrival.

Staging and configuration

Stage it before it ships.

Talk to our staging team about pre-configuring your equipment off-site. We typically respond within one business day.