Critical IT and office moves,
planned around the working day.
We move and deploy critical IT, from a single server room to an office floor or a whole building. Planned with your teams, moved by our engineers, then installed, connected and tested before people are back at their desks.
- Server rooms
- Comms rooms
- Office floors
- Relocations
- Out of hours
01Overview
Planned before anything moves.
Moving IT equipment, whether it is a server room, an office floor or a full building, needs careful planning and experienced hands. We manage the whole process, from survey and planning through decommissioning, packing and transport to installation, network configuration and post-move testing.
The physical work is scheduled around your business, usually in the evening or over a weekend, to a plan agreed with your IT, facilities and business teams. Every item is on a move register with its old and new location, and every desk and service is tested before handover.
What you get
- Minimal disruption to the business
- Full planning and coordination
- Equipment handled by engineers who know it
- Secure, tracked transport
- Every service tested after the move
- Complete documentation at handover
02Move night
One night, end to end.
An illustrative overnight move of a comms room and an office floor. Press play or drag the timeline to step through it.
03What's included
From the first survey to the first log-in.
One team and one plan for the equipment, the network and the people who use them.
- 01
Project planning
Surveys of both sites, a schedule and stakeholder coordination, so every team, dependency and deadline is accounted for before anything moves.
- 02
Move register
Every asset recorded with its current and new location, labelled before it is disconnected and checked in at the other end.
- 03
Equipment handling
Packing, secure transport and careful installation of critical IT and office equipment, by engineers who understand what they are carrying.
- 04
Installation and configuration
On-site installation, network configuration and system integration, so everything is connected, powered on and ready for use.
- 05
Validation and testing
Post-move testing of every desk, device and service, with the results documented for your records.
- 06
New offices
Moving into a new building? Our Workplace Technology team delivers the fit-out from the duct to the desk, under one contract.
04How we deliver
Both sites surveyed before the plan is written.
The plan is built from what is actually on site at both ends, and agreed with every team it affects.
- 01
Survey
Both sites, the kit, access routes, lifts and loading bays, and power and network at the destination.
- 02
Plan
Schedule, move register, labelling to destination, rollback points, and who needs to know what and when.
- 03
Move
Shutdown, decommission, pack and transport, usually out of hours.
- 04
Install and connect
Comms room first, then the desks: racked, patched, powered and configured.
- 05
Test and hand over
Every desk and service tested against the register, snags fixed and records handed over.
05At a glance
Specification
- Stage
- Build & Delivery
- Scope
- Server rooms, comms rooms, office floors and whole buildings
- Timing
- Scheduled around your business, often evenings and weekends
- Includes
- Planning, packing, transport, installation, network configuration and testing
- Handover
- Move plan, move register, test results and as-installed records
- Works with
- White glove logistics, secure storage, Workplace Technology
06Questions
Common questions
Can the move happen outside working hours?
Yes. We plan the physical work for evenings or weekends where the business needs it, agreed with your teams in advance, so people leave a working system and come back to one.
Do you handle the network and configuration as well as the physical move?
Yes. Installation covers network configuration and system integration, and every service is tested after the move before we hand over.
We are moving into a new office. Can you do the fit-out too?
Yes. Our Workplace Technology team covers new offices from the duct to the desk: cabling, WiFi, AV, comms rooms and devices, under one contract.
Can equipment be stored between the old site and the new one?
Yes. Equipment can be held in our secure storage, climate-controlled, inventoried and asset-tagged, until the new site is ready.
Critical IT & office moves
Send us the sites and the dates.
Talk to our deployment team about your next relocation or rollout, from one comms room to a whole building.