The data centre lifecycle, end to end.

From the first question about where capacity should go to the day-to-day running of a live hall. Most providers cover a piece of the lifecycle. We cover all of it, with one team accountable from first conversation to day-to-day run.

Explore the stages
stages
6
capabilities
30
accountable team
1
Scroll
Dwg
OX-LCY-01
Rev
4.0
Stages
06
Scale
NTS

01Stage by stage

Thirty capabilities in six stages.

01Stage 1 of 6

Strategy & Advisory

Before anything is bought or built: where the capacity should go, which providers could host it, and whether an existing site is ready for what is coming. Independent advice grounded in what works on site.

Requirements are written down, candidate sites are assessed for power, connectivity and risk, and a feasibility study is signed off.

  1. Site selectionGuide
  2. Provider evaluationSolution
  3. Data centre readiness assessmentsService
  4. Feasibility studiesSolution
  5. Requirements definitionSolution

RelatedProfessional ServicesAssessmentsProgramme & Project Management

02Stage 2 of 6

Acquisition & Commercial

Independent sourcing and the commercial work around space, power and connectivity. With AVANT Pathfinder we compare 330+ providers and 1,600+ data centres on real data and live pricing.

Providers are compared on real data, the shortlisted facility goes through due diligence and the lease terms are agreed.

  1. Data centre brokerageSolution
  2. Buy and sell servicesSolution
  3. Lease negotiationsGuide
  4. Due diligenceService
  5. M&A supportSolution

RelatedTechnology Sourcing & AdvisoryData Centre MapData sovereignty

03Stage 3 of 6

Design & Engineering

Greenfield and brownfield design across grey space and white space, sized for the density the hall has to carry on day one and the growth that follows.

The white space and grey space are designed around the target density, with capacity planned for the growth that follows.

  1. Greenfield designService
  2. Brownfield designSolution
  3. Grey space designSolution
  4. White space designService
  5. Capacity planningGuide

RelatedData Centre Design & BuildM&E EngineeringTechnical EngineeringWiFi Survey & Design

05Stage 5 of 6

Migration & Transformation

Moving live environments with runbooks, rehearsals and go/no-go gates, from a single cabinet to a full facility, then commissioning what lands.

Workloads move in rehearsed phases through go/no-go gates, and the new hall is commissioned.

  1. Data centre to data centre migrationsService
  2. Infrastructure transformationsSolution
  3. Hyperscale deploymentsService
  4. Legacy upgradesGuide
  5. CommissioningService

RelatedMigrations & TransformationsWhite Glove LogisticsMigration playbook

02One team

Every handover loses context.

When each stage goes to a different contractor, every handover means drawings, decisions and context passed to people who were not there when they were made.

We cover the whole lifecycle: strategy, site selection, design and build, white space fit-out, structured cabling, migrations, operations and ongoing managed services. One team, one relationship, and full accountability throughout.

Split across contractors

  1. 01Strategy
  2. 02Acquisition
  3. 03Design
  4. 04Build
  5. 05Migration
  6. 06Operate

Five handovers, each with its own drawings, decisions and context to pass on

One Optronix team

  1. 01Strategy
  2. 02Acquisition
  3. 03Design
  4. 04Build
  5. 05Migration
  6. 06Operate

One continuous record, from first brief to day-to-day run

  • 01

    One relationship

    The people who plan the hall stay with it through the build, the move and the running of it, so decisions are made by people who know why the last ones were taken.

  • 02

    Built for scale

    Whether it is a 5-rack deployment or thousands of racks across multiple sites, the standards and the documentation stay the same.

  • 03

    Engineers first

    Our people understand cabling standards, power chains and cooling, and how they behave inside a live data hall, not just on a Gantt chart.