The white space,
where your IT lives.

Rack layout, containment, cable routing, and power and cooling integration, designed and installed so the hall runs efficiently now and scales for what comes next.

  • Rack layout
  • Hot and cold aisles
  • Containment
  • Busbar and PDUs
  • Cooling integration
Fig. 04 / Contained cold aisleIso, row B cut away
Scroll
Dwg
OX-SVC-04
Stage
Design & Engineering
Rev
4.0
Scale
NTS

01Overview

Laid out for density, built to scale.

White space is where your IT equipment actually sits. How it is designed and built decides power density, cooling efficiency and how easy the space is to operate and maintain day to day.

We design and install white space that makes the most of the floor: rack placement, airflow, power distribution and cable routing. New build or retrofit, the result works well now and scales for what comes next.

What you get

  • Optimised rack layout and placement
  • Hot and cold aisle configuration
  • Effective cable management
  • Room to grow
  • Better cooling and airflow
  • Standards-compliant installation

02Airflow

What containment does to the airflow.

Cold supply air should reach the rack inlets, and hot exhaust should go straight back to the cooling units. Switch containment on and off in this illustrative section through a pair of rows to see the difference.

Fig. 04.1 / Section through a row pair
RecirculationHighHot exhaust spills over the racks back into the inlets
BypassHighCold supply air returns without reaching a server
Inlet airMixedWarmer at the top of the rack than at the bottom
Return airMixedCooled by bypass air before the cooling unit sees it

Illustrative section: airflow paths are simplified to show the principle, not modelled for a real hall.

03What's included

Everything in the white space.

New build or retrofit, we design the layout and install what goes into it, so what gets built matches what was designed.

  • 01

    Layout design and planning

    Rack placement, hot and cold aisle configuration and density planning, designed to maximise usable capacity and operational efficiency from the outset.

  • 02

    Rack installation

    Server racks, cabinets and supporting infrastructure installed aligned, spaced and secured to your specification.

  • 03

    Containment systems

    Hot or cold aisle containment that separates the airflows, improves cooling performance and reduces energy use across the hall.

  • 04

    Power and cooling integration

    PDUs, busbar, cooling units and monitoring integrated into the layout, so everything works together as designed.

04How we deliver

From a drawing to a working hall.

Send us a drawing and we can return a costed design in under 48 hours. Whitespace Builder, our in-house tool, produces the 3D model, the 2D drawings and the counts from one model.

  1. 01

    Survey and brief

    Floor, structure, power, cooling and density targets captured, with the constraints.

  2. 02

    Layout

    Rack positions, aisle orientation and containment chosen; power and data pathways routed.

  3. 03

    Costed design

    A model-derived design with drawings and counts, ready to price and review.

  4. 04

    Install

    Racks positioned, levelled and bonded; containment, power and cable management fitted.

  5. 05

    Check and hand over

    The installation checked against the design and documented.

05At a glance

Specification

Layout
Rack placement, hot and cold aisles, density planning
Containment
Hot or cold aisle, with doors, roofs and blanking
Power
Rack PDUs and busbar
Cooling
Cooling units and airflow management, liquid-ready where needed
Cabling
Overhead or underfloor pathways and cable management
Design turnaround
A costed design from your drawing in under 48 hours
Scope
New builds and retrofits

06Questions

Common questions

Hot aisle or cold aisle containment?

Both separate supply and exhaust air. Cold aisle containment is often simpler to retrofit into an existing room; hot aisle containment returns hot air straight to the cooling units and keeps the rest of the room cool. The right choice depends on the room, the cooling system and the density.

Raised floor or slab?

A raised floor delivers cooling through perforated tiles and hides cabling, but limits floor loading and airflow at high densities. A slab floor with overhead power and cabling suits heavier, denser racks. Our white space guide covers the trade-offs.

Can you design for high-density and AI racks?

Yes. We plan for the density you need on day one and in the years after: power to the rack, containment, pods of mixed density and space for liquid cooling. See our AI and GPU data hall guide.

How quickly can we see a design?

Send us a drawing and we can return a costed, model-derived design in under 48 hours.

White space

Send us the floor plan.

Talk to our design team about a new hall, a retrofit or a change of density. We typically respond within one business day.